klarester-bioficient-system-installationFoxwell Cottage, Henley-on-Thamesukpd-logo

Case Study 2

Klargester Bioficient Installation – A recent installation of a Klargester Bioficient 1 system as result of a successful insurance claim managed by UKDP.

This was another small garden which was accessed by removing a section of the front hedge.

The impact was kept to a minimum and the client is delighted with the low profile look of the Klargester system.

Please click on image to enlarge