WTE Falcon Installation Chertsey SurreyA recent installation of a WTE Falcon system on a property in Chertsey.  We encountered running sand at 1mtr depth so used a full interlocking shoring system to enable the excavation to be formed.  The sheets were installed using a hydraulic hammer which means a larger excavator is required.

Please click on image to enlarge